Differences between revisions 12 and 14 (spanning 2 versions)
Revision 12 as of 2012-02-26 16:58:54
Size: 1141
Comment:
Revision 14 as of 2012-03-01 00:09:12
Size: 1266
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Line 4: Line 3:
Line 10: Line 8:
Line 14: Line 11:
||Name ||Origin ||Available dates ||
||Matt Mackall ||Minneapolis ||* ||
||Pierre-Yves David ||Paris ||Any, (-0 for Mar 30) ||
||Augie Fackler ||Chicago ||Prefer 23-25, -0 for 16-18 since pycon is the preceding weekend, -1 for Apr 6-8 which is Easter weekend ||
||Sean Farley ||Chicago ||* ||
||Brodie Rao ||San Francisco ||* ||
||Greg Ward ||Montreal ||* ||
||David Soria Parra ||Karlsruhe ||Apr 6-8 ||
||Martin Geisler ||Zurich ||* ||
||Patrick Mézard ||Paris ||land back in Paris Mar 28 in the morning, leaving Mar 29 is doable, prefer Apr 6-8 ||
||Mads Kiilerich||Copenhagen||Marts||
Line 15: Line 23:
||Name||Origin||Available dates||
||Matt Mackall||Minneapolis||*||
||Pierre-Yves David||Paris||Any, (-0 for Mar 30)||
||Augie Fackler||Chicago||Prefer 23-25, -0 for 16-18 since pycon is the preceding weekend, -1 for Apr 6-8 which is Easter weekend||
||Sean Farley||Chicago||*||
||Brodie Rao||San Francisco||*||
||Greg Ward||Montreal||*||
||David Soria Parra||Karlsruhe||Apr 6-8||
||Martin Geisler||Zurich||*||
||Patrick Mézard||Paris||Apr 6-8, maybe||
Line 28: Line 27:
Line 37: Line 35:
Line 41: Line 38:
Line 43: Line 39:

2.2 Sprint

Planning the 2.2 sprint

1. Attendees

<!> Subscribe to this page to get email updates!

Attendance is open to all Mercurial contributors. We will try to reimburse travel costs for core contributors.

Name

Origin

Available dates

Matt Mackall

Minneapolis

*

Pierre-Yves David

Paris

Any, (-0 for Mar 30)

Augie Fackler

Chicago

Prefer 23-25, -0 for 16-18 since pycon is the preceding weekend, -1 for Apr 6-8 which is Easter weekend

Sean Farley

Chicago

*

Brodie Rao

San Francisco

*

Greg Ward

Montreal

*

David Soria Parra

Karlsruhe

Apr 6-8

Martin Geisler

Zurich

*

Patrick Mézard

Paris

land back in Paris Mar 28 in the morning, leaving Mar 29 is doable, prefer Apr 6-8

Mads Kiilerich

Copenhagen

Marts

2. Dates

The sprint will run from Friday morning to Sunday evening on one of the following weekends:

  • Mar 16 - 18
  • Mar 23 - 25
  • Mar 30 - Apr 1
  • Apr 6 -8

3. Locations

Open for suggestions. Preferably in the eastern US.

4. Sponsors

Judging from previous sprints, we'll need about $5000USD in sponsorship for hotel and airfare.


CategoryMeetings

2.2sprint (last edited 2013-09-01 14:13:27 by KevinBot)